• A method of embedded pipe and outlet box was adopted in the joint grouting system of Wanjiazhaidam.

    万家寨水利枢纽大坝接缝灌浆系统采用预埋管路方式

    youdao

  • The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the first time applied in the karst area.

    航站楼主体结构采用冲孔设计采用的压浆预应力管桩首次岩溶地区应用

    youdao

  • The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...

    航站楼主体结构采用冲孔桩设计采用的预应力管桩首次岩溶地区应用。

    youdao

  • The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...

    航站楼主体结构采用冲孔桩设计采用的预应力管桩首次岩溶地区应用。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定