• Based on fuzzy set theory, a fuzzy design trade off method has been presented in the paper, which supports the philosophy of concurrent engineering.

    本文基于模糊集合原理,提出支持并行工程实践模糊设计折衷方法

    youdao

  • Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model, which is used in the engineering project quality risk analyses.

    模糊数学层次分析方法相结合建立模糊层次分析模型应用工程项目质量风险分析

    youdao

  • Fuzzy math and the theory of AHP are combined to set a fuzzy overall analysis model, which is used in the engineering project quality risk analyses.

    模糊数学层次分析方法相结合建立模糊层次分析模型应用工程项目质量风险分析

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定