Making an approach to the time scale of several tens to hundreds years of engineering geological process is put forward and inquired in this paper.
对几十年到几百年的时间尺度上的工程地质作用进行了探讨。
In different engineering geological conditions, the construction process, the migration of overlying strata have different rules.
在不同工程地质条件下,施工过程中覆岩具有不同的运移规律。
It results in an essential leap in cognition process concerning complicated geological engineering conditions on Daliushu dam site.
这个问题的提出使得人们对大柳树复杂工程地质条件的认识有了一个质的飞跃。
As a product of geological history, rock and soil media process their special compositions and fabric structures so that their engineering behavior is very complicated.
岩土体是地质历史的产物,有着特定的物质组分和结构构造,从而表现出复杂的工程力学性质。
The engineering geological condition, pit support design and its construction process in Beijing Century Building Project are mainly introduced in this article.
介绍了北京创世纪大厦工程的场区工程地质条件、基坑边坡支护设计和支护施工工艺。
The engineering geological condition, pit support design and its construction process in Beijing Century Building Project are mainly introduced in this article.
介绍了北京创世纪大厦工程的场区工程地质条件、基坑边坡支护设计和支护施工工艺。
应用推荐