• The development procedure of the muddy water system is introduced in the test study of the braided reach realignment engineering measure odf multi-sand river.

    介绍了多沙河流游荡河段整治工程措施试验研究课题系统研制过程

    youdao

  • The Engineering & Technical Department is responsible to calibrate the test equipment according to the "Inspection, Measuring and Test Equipment Control Procedure".

    工程技术部负责检验测量试验设备控制程序》规定要求校准实验设备。

    youdao

  • The Engineering & Technical Department is responsible to calibrate the test equipment according to the "Inspection, Measuring and Test Equipment Control Procedure".

    工程技术部负责检验测量试验设备控制程序》规定要求校准实验设备。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定