• The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test.

    分析表明核电工程建设关键路径核岛土建、核岛安装、与一回路冷态调试相关系统调试及联合调试。

    youdao

  • Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.

    安装检查&测量应在主要结构设备安装前后进行。 在设备试车之前应联合检查设备对位情况

    youdao

  • Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.

    安装检查&测量应在主要结构设备安装前后进行。 在设备试车之前应联合检查设备对位情况

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定