The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test.
分析表明,核电工程建设的关键路径是核岛土建、核岛安装、与一回路冷态调试相关的单系统调试及联合调试。
Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.
安装检查&测量应在主要结构设备安装前后进行。 在设备冷试车之前应联合检查设备对位情况。
Assembly checks &survey to be taken before and after erection of major structurals 7 equipments. Joint record for checking of alignments to be made prior to cold trial of equipments.
安装检查&测量应在主要结构设备安装前后进行。 在设备冷试车之前应联合检查设备对位情况。