Then the forward calculation is also used to get the tensile cable forces of the construction process to gain a finished bridge state under the control of the former forces.
再以此索力作为正装计算的控制张拉索力,通过正装计算得到一个成桥状态。
The structural analysis for perfectly finished state and reasonable construction state of cable-stayed bridge is the focal and key point of the design.
斜拉桥理想成桥状态与合理施工状态的结构分析是其设计的重点和难点。
Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.
独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。
Taking Hebei street cable-stayed bridge as project background, this paper has a particular study to reasonable finished dead state.
本文以天津市河北大街斜拉桥为背景,对斜拉桥合理成桥状态的确定与施工控制展开研究。
The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.
以广州东沙大桥独塔边跨带辅助墩的混合梁双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重、临时荷载、结构刚度、混凝土收缩徐变这些因素对混合梁斜拉桥成桥状态的影响。
Base on the project of No. 1 bridge in Qinglongshan Park, the optimization of the final state and the analysis of the construction state are finished in this paper.
本文以青龙山公园一号桥为背景,对空间索面悬索桥合理成桥状态及施工阶段进行分析。
Base on the project of No. 1 bridge in Qinglongshan Park, the optimization of the final state and the analysis of the construction state are finished in this paper.
本文以青龙山公园一号桥为背景,对空间索面悬索桥合理成桥状态及施工阶段进行分析。
应用推荐