This paper expounds the general situation of ZhangfengReservoir in Shanxi Province, and analyzes and evaluates the engineering geologic conditions of the flood spillway of Zhangfeng Reservoir.
叙述了山西省张峰水库的工程概况,对该水库溢洪道工程地质条件进行了分析与评价。
Net cage stone is also used to spillway dam and diversion dam, flood may play a guiding effect of constraint.
笼石网也使用到泄洪坝和导流坝,起到引导或许约束洪水的效果。
Reinforced gabion mesh network is applied to the object of spillway dam and diversion dam, play a guiding role in flood or constraint.
加筋格宾网格宾网也应用到泄洪坝和导流坝,起到引导或者约束洪水的作用。
Stone cage net is applied to the spillway dam and diversion dam, flood may play a guiding effect of restraint.
石笼网也应用到泄洪坝和导流坝,起到引导或许束缚洪水的效果。
Its revised design flood is 40 % higher than its existing spillway capacity.
该水库修改后的设计洪水将比现有溢洪道泄洪能力提高40%。
Culvert and horizontal pipes and spillway with hatch control need management of person specially assigned when flood is discharged.
涵、卧管和有闸门控制的溢洪道,在泄洪运行时需要专人管理;
As the high head, high velocity and large flow of flood discharge, the concrete of spillway tunnel in Xiaowan Hydropower Station is easy to be damaged by cavitation.
小湾水电站泄洪洞在泄洪时具有高水头、高流速、泄量大的特点,对混凝土冲刷力强,容易产生空蚀破坏。
Monitoring observation localization for Geheyan Project in 1998 flood season was the deep outlets, the surface spillway, the still basin and auxiliary energy dissipators.
1998年汛期隔河岩水利枢纽观测部位为深孔、表孔及消能工。
The spillway is opened and the flood runs down rapidly.
闸打开了,洪水奔流而下。
There are two methods namely flood discharge tunnel and spillway selected and compared for flood discharge structure of the Hengquan Reservoir Project.
洪家渡水电站泄洪隧洞的设计优化,经多种设计方案的比较论证,优选出适宜于该洞自然条件和运行要求的方案三。
There are two methods namely flood discharge tunnel and spillway selected and compared for flood discharge structure of the Hengquan Reservoir Project.
洪家渡水电站泄洪隧洞的设计优化,经多种设计方案的比较论证,优选出适宜于该洞自然条件和运行要求的方案三。
应用推荐