• Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.

    采用沿脉布置无底柱分段崩落法,矿体底板倾角不足时,需要下盘岩石开掘进路

    youdao

  • The vertical and parallel relations of the trench with drill drift are summarized by the bottom structure disposal design on inclined orebody footwall.

    通过倾斜矿体下盘底部结构设计总结堑沟凿岩巷道垂直平行位置关系,经比较和验算后合理设计底部结构,减少了开采损失贫化。

    youdao

  • The vertical and parallel relations of the trench with drill drift are summarized by the bottom structure disposal design on inclined orebody footwall.

    通过倾斜矿体下盘底部结构设计总结堑沟凿岩巷道垂直平行位置关系,经比较和验算后合理设计底部结构,减少了开采损失贫化。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定