It analyzes the character and application scope of motion mechanism for three typical body welding jig, presents foundation method for practical welding jig library and standardize design idea.
分析汽车车身焊接夹具三种典型运动机构的特点及其适用范围,提出实用汽车焊接夹具参数库的建立及设计标准化思路。
The theoretic foundation is offered to the design of executing mechanism of hydraulic torque wrench.
为液压扭矩扳手执行机构的设计提供了理论依据。
First of all, this paper design and complete the hardware of the mechanism control system, on the foundation of analysis DOF and kinematics of the parallel robot.
论文首先在分析了并联机构的自由度、运动学的基础上设计完成了机构控制系统的硬件部分。
In foundation of above design, the core structure of two popular SOAP engine and open source are also studied. XML-RPC engine is extended to implement security mechanism designed above.
在设计了一个完整的安全机制的基础上,文章继续研究两个流行的SOAP引擎的内部结构和开源代码,并扩展XML -RPC的引擎,提出在其上实现了所设计的安全机制的实现方案。
We have found out in the teaching of the modeling foundation - dynamic model design that a lot of students design dynamic models using the connecting - rod - balanced hinge mechanism.
在造型基础一动态模型设计的教学中发现,很多同学设计的动态模型采用了连杆平衡铰链机构。
According to analysis, we've got the function mechanism between the pipeline and soil, and offered the theoretical foundation of design for the drainage system in the slope plasmodium.
通过前面的理论实践分析,得出了管土的作用机理,为斜坡变形体中的排水系统设计改进提供了理论基础。
On the basis of discussing the damage mechanism of cushion cap, a method of optimum design for pile group foundation is put forward in this paper.
在讨论桩基承台破坏机理的基础上,给出群桩基础设计的优化方法。
During the design of pile-raft foundation, there still exist many problems because the research on theory of piles' load-transfer mechanism is far behind the development of practice.
目前由于桩基荷载传递机理还没有完全研究清楚,桩筏基础设计无论在理论上还是在实际上都存在某些不合理的地方。
Theory foundation is offered for the control mechanism of filling stage. The results have instructive meanings in mold design and controlling injection technology.
为整个充模过程的控制机理提供理论依据,对控制注射工艺、模具设计有指导意义。
Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.
通过对厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述了水下捆绑爆破法的工艺原理、方案设计及实施效果。
Berth in Dongdu Port Area of Xiamen Port, the paper expounds the working mechanism, method design and result of execution of underwater strap-on blasting method for demolition of the pile foundation.
通过对厦门东渡19号泊位桩基码头几种桩基拆除试验及工期成本分析,重点阐述了水下捆绑爆破法的工艺原理、方案设计及实施效果。
应用推荐