This paper analyzed the problems existing in the commissioning of heat recovery boiler and steam turbine in a175MW gas-steam combined cycle generating unit and put forward the improvement proposals.
针对某175MW燃气-蒸汽联合循环机组中余热锅炉和蒸汽轮机调试存在的问题进行分析,提出改进意见。
This paper analyzed the problems existing in the commissioning of heat recovery boiler and steam turbine in a175MW gas-steam combined cycle generating unit and put forward the improvement proposals.
针对某175MW燃气-蒸汽联合循环机组中余热锅炉和蒸汽轮机调试存在的问题进行分析,提出改进意见。