• The production equipment mode of specialized area arrangement classified by oil, gas and water was broken by general drawing design of surface construction in Dong Hetang.

    河塘地面建设总图设计打破了生产设备专业分区布置模式,实现按工艺、按生产过程布置,使集中处理站成为一个真正的有机整体。

    youdao

  • The production equipment mode of specialized area arrangement classified by oil, gas and water was broken by general drawing design of surface construction in Dong Hetang.

    河塘地面建设总图设计打破了生产设备专业分区布置模式,实现按工艺、按生产过程布置,使集中处理站成为一个真正的有机整体。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定