• It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.

    龙滩水电站工程通过利用工程统一调配使用场地实现狭窄坝区的施工布置

    youdao

  • It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.

    龙滩水电站工程通过利用工程统一调配使用场地实现狭窄坝区的施工布置

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定