• The Gotthard base tunnel, 57 kilometres long, will carry high-speed trains through the heart of the Alps.

    哥达基线隧道全长57公里,它高速列车穿过阿尔卑斯山脉核心地带。

    youdao

  • Why It's Unique: Despite the mountainous topography of the region, trains traveling through the Gotthard Base Tunnel willremain at nearly the same elevation for the entire trip.

    独特之处尽管地区属于山地地形,但通过圣哥基地隧道的火车整个行程几乎处于同一海拔高度

    youdao

  • The 95.3-mile (153.5 km) long Gotthard Base tunnel network now being drilled out beneath the Alps, when finally completed in about ten years, will be the longest underground tunnel ever constructed.

    目前正在阿尔卑斯山脚开凿的圣哥隧道95.3英里(153.5公里),10以后完工,也将有史以来最长地下隧道。

    youdao

  • The 95.3-mile (153.5 km) long Gotthard Base tunnel network now being drilled out beneath the Alps, when finally completed in about ten years, will be the longest underground tunnel ever constructed.

    目前正在阿尔卑斯山脚开凿的圣哥隧道95.3英里(153.5公里),10以后完工,也将有史以来最长地下隧道。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定