Step one is to grout with low grouting pressure to fill the gravel pack interval and blocked the channels which relieves the grouting pressure in the shallow surrounding rock.
“一步”低压注浆充填壁后散体状碎石充填层,堵塞浅部围岩泄压通道;
Step one is to grout with low grouting pressure to fill the gravel pack interval and blocked the channels which relieves the grouting pressure in the shallow surrounding rock.
“一步”低压注浆充填壁后散体状碎石充填层,堵塞浅部围岩泄压通道;
应用推荐