• Based on this, the author of this paper for layer construction technology of high-rise building structure transfer paper.

    基于本文作者针对高层建筑结构转换施工技术的进行阐述

    youdao

  • Under the current situation of high-rise building construction quality of frame structure and based on problems, the Optimal Management of construction quality is presented.

    文章阐述了当前形势高层建筑框架结构施工质量现状,基于存在问题提出了施工质量优化管理措施。

    youdao

  • This thesis depicts the use of steel structure in high-rise apartment building, including the selection of structure system, analysis of calculation outcome, material and construction requirement.

    介绍结构住宅公寓中的应用包括结构体系选择计算结果分析材料构造要求。

    youdao

  • The reinforced concrete frame column of a high-rise building with frame-shear wall structure partially has a vertical deviation during construction, thus affecting its structural function.

    框架-剪力结构高层建筑钢筋混凝土框架,在施工过程局部出现超出规范允许值的垂直度偏差影响结构性能。

    youdao

  • By an engineering case, the design and construction method for su pp ort system of the structure transition plate in high-rise building are discussed in this paper.

    结合工程实例,讨论了钢筋混凝土厚结构转换施工支撑系统设计施工方法

    youdao

  • Familiar with the Chinese high-rise building codes, with the ability to coordinate with structure and MEP engineers and engineering consultants, and with experience in construction administration.

    熟悉中国超高层项目设计规范具有结构机电工程师工程顾问沟通能力施工管理经验

    youdao

  • With the expansion of the scale and complex structure for projects, it is more difficult for construction scheduling control and management of super high-rise building.

    随着超高层建筑工程规模日益扩大结构日趋复杂导致施工进度控制管理难度加大。

    youdao

  • With the expansion of the scale and complex structure for projects, it is more difficult for construction scheduling control and management of super high-rise building.

    随着超高层建筑工程规模日益扩大结构日趋复杂导致施工进度控制管理难度加大。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定