The accuracy of inclining wall and column location is ensured through adopting CAD assisted location and the combination control in field test.
在施工中采用以CAD辅助定位,现场测设的内、外控结合的方法,确保了斜墙、斜柱定位的准确度。
The accuracy of inclining wall and column location is ensured through adopting CAD assisted location and the combination control in field test.
在施工中采用以CAD辅助定位,现场测设的内、外控结合的方法,确保了斜墙、斜柱定位的准确度。
应用推荐