The filter settlement tank to be built at end of ditch. The construction water and storm water is discharged to the creek in chemical industrial zone after settlement.
排水沟末端设置一个滤水沉淀池,现场施工用水及雨水经沉淀池沉淀过滤后排入化工区河浜内。
Kashgar Middle and South Asia Industrial Park now has built 2 lift pumps, a head tank and 23.6 km pipelines which can constantly supply water 24h a day.
喀什中亚南亚工业园目前已建成提升泵站、高位水池和23.6公里供水管道,可保证24小时不间断供水。
Kashgar Middle and South Asia Industrial Park now has built 2 lift pumps, a head tank and 23.6 km pipelines which can constantly supply water 24h a day.
喀什中亚南亚工业园目前已建成提升泵站、高位水池和23.6公里供水管道,可保证24小时不间断供水。
应用推荐