The later includes well spacing, injection mode (gas injection or gas alternating water injection), solvent cumulative injection amount and the alternating frequency, etc.
工程因素包括井距、注入方式(注气或气水交替)、溶剂注入量、气水交替频率、射孔位置等。
The later includes well spacing, injection mode (gas injection or gas alternating water injection), solvent cumulative injection amount and the alternating frequency, etc.
工程因素包括井距、注入方式(注气或气水交替)、溶剂注入量、气水交替频率、射孔位置等。
应用推荐