In combination with steel box girder construction by incremental launching method, the paper introduced the construction technique of variable depth curved steel continuous box girder.
结合钢箱梁顶推实例,介绍了变高度曲线连续钢梁顶推施工技术,总结了该施工方法的经验,对类似桥梁的施工有参考价值。
The length, rigidity and weight of a launching nose have significant influences on the internal forces of incrementally-launched main girder at construction stage.
导梁的长度、刚度及重量在顶推施工阶段对顶推主梁的内力有着重要的影响,其合理配置是全桥顺利顶推的关键。
The structure of high web is often adopted in the overhead launching gantrys main girder that are connected by the high-strength bolts.
造桥机主梁一般采用高腹板箱梁结构,主梁之间通过高强螺栓群相互连接。
In this paper, some key problems of applying incremental launching in cable-stayed bridge with steel box girder are studied and discussed, for the design and construction of bridges alike.
而钢箱梁顶推施工近期应用日益广泛,但是理论研究却滞后于工程设计实际,因此,本文选择钢箱梁斜拉桥顶推施工的关键问题进行分析,为同类桥梁的设计和施工提供参考。
However, there is no feasible method for quantitative assessment of the strength of hull girder and safety of airbags during launching process.
近年采用气囊下水的船舶重量不断增大,下水安全性问题日益突出。
However, there is no feasible method for quantitative assessment of the strength of hull girder and safety of airbags during launching process.
近年采用气囊下水的船舶重量不断增大,下水安全性问题日益突出。