• The paper studies the control function of contact leakage in the connected section between cut-off wall and core of the dam foundation of the Xiaolangdi Reservoir through indoor tests.

    通过室内试验研究小浪底水库坝基防渗墙心墙连接接触渗流控制性能

    youdao

  • The paper studies the control function of contact leakage in the connected section between cut-off wall and core of the dam foundation of the Xiaolangdi Reservoir through indoor tests.

    通过室内试验研究小浪底水库坝基防渗墙心墙连接接触渗流控制性能

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定