Zaha Hadid Architects have completed a number of projects this year, including the London 2012 Aquatics Centre and the zigzagging Riverside Museum in Glasgow - read more about Zaha Hadid here.
扎哈·哈迪德建筑师事务所今年已经完成了一定数目的项目,包括伦敦2012游泳中心和位于格拉斯哥的之字形河畔博物馆——点击此处查看更多关于扎哈·哈迪德的内容。
Preparatory work has begun on the site of the Aquatics Centre in east London. The facility will include two 50m swimming pools and a 25m diving pool.
位于伦敦东部的水上中心的准备工作已开始就绪,该场馆包括两个50米的游泳池和一个25米的跳水池。
Preparatory work has begun on the site of the Aquatics Centre in east London. The facility will include two 50m swimming pools and a 25m diving pool.
位于伦敦东部的水上中心的准备工作已开始就绪,该场馆包括两个50米的游泳池和一个25米的跳水池。
应用推荐