Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
应用推荐