• Analysis is made on the main three phases of the expense control for highway engineering, especially in the methods, contents, requirements and objects of each phase.

    费用控制三个主要阶段进行分析每一阶段的控制方法与控制内容作出说明控制要求控制目标进行探讨。

    youdao

  • The main contents of 2004/104/EC, the latest revision of EU instruction 72/245/EEC on the technical requirements of EMC, is introduced here with its changes and points for attention.

    就汽车电磁兼容(EMC技术要求介绍欧盟指令72/245/EEC最新修订版2004/104/EC主要内容指出主要变化注意的问题。

    youdao

  • The main contents of 2004/104/EC, the latest revision of EU instruction 72/245/EEC on the technical requirements of EMC, is introduced here with its changes and points for attention.

    就汽车电磁兼容(EMC技术要求介绍欧盟指令72/245/EEC最新修订版2004/104/EC主要内容指出主要变化注意的问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定