Due to the influence of topography and the environment, traveling carriage is adopted in main girder construction of this bridge.
红枫湖大桥由于受其所处地形和其周边环境的影响,因此该桥主梁的施工方法采用挂篮施工。
This paper expounds the design idea and main contents of construction control system in Self-anchored Suspension Bridge with different girder stiffness.
本文系统地阐述了不同主梁刚度的自锚式悬索桥施工控制系统的设计思路和主要内容。
The length, rigidity and weight of a launching nose have significant influences on the internal forces of incrementally-launched main girder at construction stage.
导梁的长度、刚度及重量在顶推施工阶段对顶推主梁的内力有着重要的影响,其合理配置是全桥顺利顶推的关键。
This paper introduces the concrete pouring of continuous box girder of main structure of the bridge and the tension construction technology.
重点介绍了该桥的主桥上连续箱梁混凝土浇筑以及张拉施工技术。
The hanging baskets are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.
挂篮是目前大跨径预应力混凝土连续刚构桥和连续梁桥在悬臂浇注施工时主要采用的施工设备。
To prefabricate box-girder is important in concrete cable-stayed bridge construction, it affects directly the main bridge construction of assembly progress and packing accuracy.
箱梁的预制是钢筋混凝土斜拉桥施工中的重要环节,它直接影响到主桥施工的吊装进度和拼装精度。
The stress level and distribution of the main girder during construction and service stage at 1/30 model are studied.
借助1∶30的整体模型,研究了施工阶段、成桥阶段全桥主梁的应力水平及分布状况。
The main girder has the same construction that the boom girder.
主梁具有相同的建设,繁荣梁。
It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.
这是首次使用移动模架在建设共和斜拉桥主梁,这是一个单一的住宿表面,单塔斜拉桥的桥。
This paper analyzes in details the crack causes of the main girder in an engineering, and introduces the strengthening treatment and the construction methods.
文章详细分析了某工程主梁的裂缝原因,并介绍了加固处理及施工方法。
The cantilever construction method is used and the main girder is divided into several sections and steps of pouring and prestressing.
文章详细叙述了颍河特大桥主桥挂篮进行悬臂浇筑的施工方法和工艺等。
Further in the light of the actually-divided construction stages of the bridge, the mechanical behavior and deformation conditions of the main girder...
根据该桥实际划分的施工时段,计算桥梁从施工到成桥任一时刻主梁和主塔受力和变形状态,并提出了一些有益的建议。
Further in the light of the actually-divided construction stages of the bridge, the mechanical behavior and deformation conditions of the main girder...
根据该桥实际划分的施工时段,计算桥梁从施工到成桥任一时刻主梁和主塔受力和变形状态,并提出了一些有益的建议。