• First close manual shutoff located before the fill-valve, then draw system pressure down to 12psi (or other preset pressure) and observe system for pressure buildup several hours later.

    首先关闭位于进水之前手动关闭阀,然后系统压力降到12psi(其他预设压力),几个小时观察系统压力上升状态。

    youdao

  • First close manual shutoff located before the fill-valve, then draw system pressure down to 12psi (or other preset pressure) and observe system for pressure buildup several hours later.

    首先关闭位于进水之前手动关闭阀,然后系统压力降到12psi(其他预设压力),几个小时观察系统压力上升状态。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定