The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
整个过程开始于第一级MPS (Master Production Schedule,主生产计划).这是要用于最终库存的已知需求、预想和产品的综合。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
Analyze customer orders, prepare Master Production Schedule accurately, maintain related figure into system, prepare capacity offering report.
分析客户订单,安排主生产计划,维护系统数据,提供能力报表。
This paper also analyzes and studies the factors of Master Production Schedule (MPS) and capacity planning, which are integrated with the market trend of Semiconductor industry.
本文结合行业的市场形势,对影响主生产计划(MPS)的因素和产能规划进行了分析研究。
Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。
Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。