The master production scheduling is certain the production scheduling of each concrete product at each concrete time.
主生产计划是确定每一个具体产品在每一个具体时间段的生产计划。
The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.
建立了热轧无缝钢管主生产计划问题的混合整数线性规划模型。
On the basis of those key problems, the application of case based reasoning in resource requirements was discussed and the basic structure of the master production scheduling system was proposed.
为了快速、准确地获得最佳的主生产计划,在分析主生产计划系统中关键问题的基础上,探讨了基于事例推理技术在资源需求求解中的运用,提出了基于事例推理的主生产计划系统基本结构。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。