• The master production scheduling is certain the production scheduling of each concrete product at each concrete time.

    生产计划确定一个具体产品每一个具体时间段生产计划。

    youdao

  • The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.

    建立了热轧无缝钢管生产计划问题混合整数线性规划模型

    youdao

  • On the basis of those key problems, the application of case based reasoning in resource requirements was discussed and the basic structure of the master production scheduling system was proposed.

    为了快速、准确地获得最佳生产计划分析主生产计划系统关键问题基础上,探讨了基于事例推理技术在资源需求求解中的运用,提出了基于事例推理的主生产计划系统基本结构

    youdao

  • According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.

    根据生产运行计划掌握生产进度平衡调度人力、并达到出产需求

    youdao

  • According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.

    根据生产运行计划掌握生产进度平衡调度人力、并达到出产需求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定