Arrange site job according to electrical master schedule;
根据电气安装进度,安排现场工作;
Is the Master schedule planned and managed at the site leve?
在现场主(总)计划是否被策划并得到管理?
Maintain the Job-boss. Control the master schedule of production.
保持工作的老板。控制总表生产。
Indoctrinate the importance of always having a feasible Master Schedule in place.
灌输始终有一个可行的主计划及时到位的重要性。
Ensures that the appropriate Master Schedule is always loaded that meets the customer requirements and minimizes Jabil liability.
确保计划部至始至终导入的是符合客户需求和最大限度地减少捷普公司责任的主计划。
If necessary, two Parties may adjust any items specified herein according to the master schedule of the Contract Plant through discussion.
如有必要,双方可根据合同项目的进展情况通过协商调整本附件所规定的任何事项。
On top of those important goals, I have also complied with the important milestones defined by the overall master schedule at each six-week point.
在这些重要目标之上,我还照做了每个六周的整体综合时间表定义的重要里程碑。
Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.
图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。
Each day was apportioned into a rigid schedule of workshops and readings and master classes on craft.
会议每天都有硬性安排,包括研讨会、阅读和写作技巧大师课。
Bearing in mind that the Master Version 2.0 Schedule is just the framework, I realize that I don't have to have three six-week consecutive iterations.
记住主要的2.0版本时间表仅仅是一个架构,我意识到我并不需要三个六周连续的迭代。
For example, the master single-tier schedule in Figure 10 has the overall Construction phase divided into three six-week periods.
例如,图10中单层的综合图表将整个构建阶段分为三个六周的周期。
The process starts at the top level with a Master Production Schedule (MPS). This is an amalgam of known demand, forecasts and product to be made for finished stock.
整个过程开始于第一级MPS (MasterProductionSchedule,主生产计划).这是要用于最终库存的已知需求、预想和产品的综合。
We believe it's a good idea to apply mobile learning to the learning process of master of education, and it would be a good way for them to solve the schedule conflict.
笔者认为从理论和实际来说对于教育硕士这样一群特殊的学习群体移动学习是一个较好的学习方式,能够较好的解决学习者的工学矛盾。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
The 2011 master plan recommendations do not specify an implementation schedule or a funding mechanism.
2011年总体规划建议没有明确的实施时间表或筹资机制。
Update and maintain the Master Production Schedule as changes are identified in order for the MRP to reflect accurate, up-to-date information.
更新和维护主生产计划确定的变化,以便使MRP准确反映最新的信息。
Analyze customer orders, prepare Master Production Schedule accurately, maintain related figure into system, prepare capacity offering report.
分析客户订单,安排主生产计划,维护系统数据,提供能力报表。
This paper also analyzes and studies the factors of Master Production Schedule (MPS) and capacity planning, which are integrated with the market trend of Semiconductor industry.
本文结合行业的市场形势,对影响主生产计划(MPS)的因素和产能规划进行了分析研究。
The organizer of the event reserves the final right to arrange or alter the schedule of Master Coaching & Rehearsals.
主办机构有绝对最终权安排或更改舞台指导及表演排练班的时间。
Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.
同时采取了及时有效的纠偏措施,运用了多种方法和措施控制了进度,确保了该项目按总体计划进行并按期实现项目投产。
Dear Web master, first of all, thanks for your busy schedule to visit this page!
尊敬的网络高手,首先,感谢您能在百忙之中访问本页!
Dear Web master, first of all, thanks for your busy schedule to visit this page!
尊敬的网络高手,首先,感谢您能在百忙之中访问本页!
应用推荐