• Basically, we need to use up to a maximum voltage or up to a maximum current but the operating point will never require both at once.

    基本上我们需要使用达到最大电压最大电流但是运行永远也不需要立刻达到这两个

    youdao

  • The coefficient of grounding is the ratio of the maximum sustained line-to-ground voltage during faults to the maximum operating line-to-line voltage.

    接地系数故障最大持续电压与最大运行线电压之

    youdao

  • The coefficient of grounding is the ratio of the maximum sustained line-to-ground voltage during faults to the maximum operating line-to-line voltage.

    接地系数故障最大持续电压与最大运行线电压之

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定