Pertinent measures of temperature control and crack prevention are suggested, settling the practice problems in projects.
并针对性地提出了相应的温控防裂措施,以解决工程实际问题。
The effect of the construction of project, we can say that the measures of temperature control and ANSYS numerical simulation are effective and feasible.
工程的实际施工效果说明,应用的大体积混凝土温控措施和ANSYS模拟是有效和简便易行的。
This paper states the temperature stress and load value, puts forward the conformation measures of crack control in structural design and construction.
本文论述了温度应力、温度荷载的取值,并根据实际情况提出了结构设计和施工时裂缝控制的构造措施。
This article analyses process principle of mp absorber after revamping, and presents the preventive measures for control of mp absorber temperature during its startup.
通过对中压吸收塔改造后的工艺原理分析,提出在开车过程中中压吸收塔温度控制的预防措施。
Based on the mechanism of defect formation for thin slab, this paper discusses control measures of molten steel smelting, including its chemistry, temperature, tramp elements, inclusions, etc.
从薄板连铸坯缺陷产生的机理出发,探讨了钢水化学成分、温度、残存元素、夹杂等方面应采取的控制措施。
Started from the analysis of gate concrete temperature control, the paper made a brief study on temperature control methods and construction control measures in the process of construction.
为解决这一难题,本文从水闸混凝土温度控制问题的分析入手,对水闸混凝土施工过程中的温控方法和施工控制措施进行了简要探究。
On the premise of security operation, to decrease the exhaust gas temperature and to control surplus air are both effective measures of energy-saving.
因此在考虑加热炉安全运行的前提下,降低排烟温度以及控制过剩空气系数是比较有效的节能措施。
According to requirement of aim temperature to implement compensated measures can effectively control the molten steel temperature.
按目标温度要求,进行补偿措施,有效地控制钢水温度。
Therefore well controlling of difference in temperature and temperature strain are important measures on concrete cracking control.
因此,控制好内外温差和温度变形是防止大体积混凝土出现裂缝的重要方法。
Measures of crevices preventing such as the control of temperature and interval of expansion joint are given forth.
提出了温度控制与伸缩缝最大间距控制等防止引起裂缝的措施。
The paper presents various temperature control measures taken in ground concrete placement at permanent lock of Three Gorges Project during summer construction of 1999 .
介绍了三峡工程永久船闸地面混凝土在1999年夏季施工中所进行的各种温控措施。
It is demonstrated that the temperature control measures are correlative to each other, and that comprehensive measures should be taken for temperature control of massive RCC in semitropical area.
分析结果表明,混凝土浇筑过程中所采取的各单项温控措施之间是相互关联的,在亚热带地区施工的大体积碾压混凝土需要采取综合的温控措施。
Therefore, a series of technical measures are adopted in actual construction has taken for temperature control of concrete construction.
因此,在实际施工中采取了一系列技术措施对混凝土施工进行温度控制。
Pipe cooling is one of the most temperature control measures of concrete of arch DAMS.
水管冷却是拱坝混凝土的主要温控措施之一。
Through project example, the temperature monitoring of mass concrete and application of comprehensive temperature control measures in engineering construction of mass concrete were introduced.
通过工程实例,介绍了大体积混凝土的温度监测及综合温控措施在大体积混凝土工程施工中的应用。
Therefore, the subject of analysis for temperature stress and research for temperature control measures of RCC dam is very important for dam design and construction.
因此对碾压混凝土坝的温度应力分析和温控防裂措施的研究是设计和施工中的重要课题。
During the construction process, keeping abreast of the safety status of the frozen soil curtain by temperature field monitoring and analyzing is one of the important measures for risk control.
在施工过程中,通过温度场监测分析掌握冻土帷幕的安全状态,是风险控制的重要手段之一。
The approximate calculation methods to control the cracks in the top wall of brick and concrete structure due to temperature difference and the related precaution - ary measures are put forward.
提出了控制砖混结构墙顶温度裂缝的近似计算方法以及有关防治措施。
This paper briefly introduces the main results of temperature control measures and temperature super vision of mass concrete of main tower of Jingzhou Yangtze River Highway Bridge.
简要介绍了荆州长江公路大桥混凝土主塔大体积混凝土监控措施及温度温测主要结果;
After analysis for the unit, the causes were found and some measures were taken to obtain good temperature reduction effect for the bearing pads by changing the admission flow of control valves.
经过对机组分析,找出了问题的原因,并采取了处理措施,通过改变调门部分进汽度取得了良好的轴瓦降温效果。
In order to raise the device's precision, it takes measures such as temperature compensation and so on. And the application of control circuit decreases the device's blind area.
为了提高系统的精度,采取了温度补偿等一系列措施,而且使用硬件电路的设计以减小系统的盲区。
Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.
简述了三峡工程永久船闸六闸首边墙混凝土高温季节施工的温控措施。
Conclusion the density and population of flies vary with the season and breeding environment, with temperature, the breeding environment and the control measures being the major influencing factors.
结论不同季节、不同生态环境的蝇类密度和种群均有差异,气温、孳生环境、防治措施是主要的影响因素。
Conclusion the density and population of flies vary with the season and breeding environment, with temperature, the breeding environment and the control measures being the major influencing factors.
结论不同季节、不同生态环境的蝇类密度和种群均有差异,气温、孳生环境、防治措施是主要的影响因素。
应用推荐