The combined support with cable bolt wire mesh and shotcreting is applied in coal roadway in Xingan coal Mine of Hegang Mining Industry Group.
鹤岗矿业集团兴安煤矿在煤巷中应用锚索锚杆挂网喷喧支护,取得了较好的技术经济效果。
Many dynamic disturbances often lead to local instability of roadway surrounding rock and mining workplace and result in rock burst in coal mining.
煤矿生产中存在着大量的动力扰动,常导致采矿巷道和采场围岩局部失稳,诱发冲击矿压发生。
On-the-spot investigation was made on the basic parameters of gas drainage in drivage roadway in Huainan Coal Mining Area, and reasonable arrangement range of rib bore-holes an...
现场考察了淮南矿区掘进巷道瓦斯排放的基本参数,确定了巷帮钻孔的有效布置范围和合理抽放时间。
It is of directive signification for choose roadway support forms of deep mining and support parameters for Xinwen coal mine area.
对新汶矿区深部煤巷支护形式的和支护参数的选择具有一定的指导意义。
Liangjia Coal Mine in Longkou mining area is a typical "three-soft" mining area, meeting many difficulties in roadway support.
龙口矿区梁家煤矿是典型的“三软”矿区,在巷道支护上遇到了非常大的困难。
The roadway manage, actual mining and support beside roadway in thin coal seam are introduced. Through planing reliable safety technology measures, better economic benefit has been achieved.
简要地介绍了薄煤层前进采煤的巷道布置、回采工艺及巷旁支护等,制定了切实可行的安全技术措施,取得较好的经济效益。
The bolting with wire mesh is commonly used actual mining roadway of the thick coal seam, and in some cases the cabling reinforcement should be considered.
采用锚网支护方式维护厚煤层放顶煤沿底回采巷道时,多数需要考虑锚索加固问题。
The coal roadway driving is a "bottleneck" problem of influencing and restricting the normal replacement of mining and driving in the outburst mines.
煤巷掘进一直是影响和制约突出矿井采掘正常接替的“瓶颈”问题。
Study was conducted on the roof of No. 3604S4 coal face and the actual mining roadway with fractals, and a few kinds of functional values of subsidence velocity of this face were obtained.
用分形对3604S4工作面和回采巷道顶板进行了研究,得到了该工作面下沉速度的几种分维值。
Technology on retaining roadway on original site in goaf after coal mining face crossing rise is put forward.
提出一种回采工作面过上山采空区原位留巷技术。
The opinion was put forward that the infection of roadway driving and coal mining need considered simultaneously when determination the reasonable width for coal pillar.
提出确定沿空掘巷合理煤柱宽度时,不仅需考虑掘巷扰动影响,还应将本工作面的超前采动影响作为一个重要影响因素。
The floor roadway should be located out of the abutment stress zone when protection coal pillar is retained, or the working face should be pushed away for enough distance under overhead mining.
留设保护煤柱时,底板岩巷应位于集中应力区的外侧或跨采时工作面应推过足够距离,使巷道靠近采空区应力恢复区的下方。
And taking roadway protection without coal-pillars in mining engineering courses as a case, the paper described in detail the operation of this process.
并以矿业工程课程中的无煤柱护巷问题作为案例对象,详细阐述了此流程的运行过程。
And taking roadway protection without coal-pillars in mining engineering courses as a case, the paper described in detail the operation of this process.
并以矿业工程课程中的无煤柱护巷问题作为案例对象,详细阐述了此流程的运行过程。