• The development procedure of the muddy water system is introduced in the test study of the braided reach realignment engineering measure odf multi-sand river.

    介绍了多沙河流游荡河段整治工程措施试验研究课题系统研制过程

    youdao

  • Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system and corresponding technical measures.

    而解决管道泥沙淤堵问题关键在于确定临界流速与之配套的工程技术措施

    youdao

  • Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system.

    而解决管道泥沙淤堵问题关键在于临界流速确定

    youdao

  • Solving sediment depositing in pipeline key of problem lied in determining non-depositing critical velocity of muddy water delivery in pipeline system.

    而解决管道泥沙淤堵问题关键在于临界流速确定

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定