The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
This paper analysises the sequence of the sections which need to be cured based on ideal point and negative ideal point method in the condition of multi-objective resource constraints.
在资源的多目标限制下,本文引入基于理想点和负理想点的方法对路面的排序进行研究分析。
This paper analysises the sequence of the sections which need to be cured based on ideal point and negative ideal point method in the condition of multi-objective resource constraints.
在资源的多目标限制下,本文引入基于理想点和负理想点的方法对路面的排序进行研究分析。
应用推荐