This paper aims at the high thrust pad temperature and abnormal axial displacement problem during the start-up course of 600 MW Supercritical Units.
针对600 MW机组启动过程中推力瓦温度高及轴向位移范围超常的问题,从形成原理及现场安装两方面加以分析,并提出处理策略。
The design and functional configuration of the boiler start-up system of the 600 MW supercritical units in Chaozhou Sanbaimen Power Plant are described in detail.
锅炉启动系统是超临界机组的关键技术之一,其与汽机旁路系统是保证机组安全、经济启停、低负荷运行及妥善进行事故处理的重要手段。
A technical and economical comparison was carried out for selection of turbine start-up mode and arrangement of its bypass system of 1 000 MW extra supercritical units in Zouxian Power Plant.
为选择邹县电厂1 000MW超超临界机组汽轮机的启动方式和旁路系统的配置方式,进行了技术分析和经济比较。
Type choosing of the main auxiliaries for matching domestic 1 000 MW ultra supercritical power units is being delineated, accompanied by a comparison between different options.
阐述了我国1 000MW超超临界压力机组主要辅机的选型和配置,并对选型和配置的情况进行了比较。
When completed, the Barth Supercritical Coal-fired Power Plant will generate a total of 1,980 MW (3 units x 660 MW), making it the largest thermal power plant in Bihar.
一旦完成,Barth超临界燃煤电厂将产生共1980兆瓦(3台X 660兆瓦)的电力,使得它成为比哈尔邦最大的火电厂。
When completed, the Barth Supercritical Coal-fired Power Plant will generate a total of 1,980 MW (3 units x 660 MW), making it the largest thermal power plant in Bihar.
一旦完成,Barth超临界燃煤电厂将产生共1980兆瓦(3台X 660兆瓦)的电力,使得它成为比哈尔邦最大的火电厂。
应用推荐