Real time capable dynamic model of boiler and non real time capable dynamic model of boiler of 330 MW unit are established.
以典型的330MW发电机组为对象分别建立了锅炉的实时和非实时动态模型。
This paper introduces collision tests used in Huaneng Yuhuan Power Plant 1 000 MW unit axial and radial alignments of turbine HP, IP and LP casings.
详细介绍了华能玉环电厂1 000MW机组采用碰撞试验的方法进行汽轮机高、中、低压缸轴向、径向定位。
The principle, system technological process and main equipment used in desulfurization project of flue gas circulating fluidized bed for 100 MW unit in Xiaolong Tan Power Plant are presented.
阐述了小龙潭发电厂100MW机组烟气脱硫工程的工艺原理、系统流程、主要设备等,并结合系统调试过程中发现的问题,对该工艺的运行调试进行了评述。
This article introduces the retrofitting process the economics of retrofitted steam turbine and finally puts forward the views and proposals for further improving the economics of 125 MW unit.
通过对汽轮机通流部分改造过程介绍和改造后的经济性分析,提出进一步提高125MW机组经济性的看法和建议。
This paper introduces water pump house caisson construction of Huaneng Yuhuan Power Plant 1 000 MW unit, including geological conditions, structure and construction preparation, ordering and scheme.
对华能玉环电厂1 000MW机组工程的雨水泵房沉井施工作了介绍,包括:地质条件、结构型式和施工准备、顺序、方案。
If you increase single unit capacity you can reduce the per MW cost.
如果您增加一个单位的能力,可以降低一兆瓦电的成本。
Each power unit of the Kursk NPP is equipped with two turbines with generators of 500 MW each.
库尔斯克核电站的每个机组都装备了500 MW功率的两个涡轮发电机。
Several kinds of faults with the EH system that occurred in initial operation period of a native-made 600 MW steam turbine unit were introduced in this paper.
文章介绍了某电厂600MW汽轮机组投产初期EH系统发生的各种故障,通过对故障进行分析研究,指出故障发生的根本原因及处理方法。
Based on the equivalent heat-drop method, the paper presents optimum design process of blowdown system in 200 MW generation unit.
利用等效焓降法对200MW机组排污扩容器系统进行了优化设计。
An introduction to the feed water's whole course automatic control system of Guohua Taichang Power co. Ltd. 's 600 MW supercritical unit is being presented.
介绍了国华太仓发电有限责任公司600MW超临界机组全程给水自动控制系统情况。
For fulfilling the instant need of operation training for gas-steam combined cycle unit, the simulator for 390 MW LNG gas-steam combined cycle unit was developed.
为满足对燃气-蒸汽联合循环发电机组培训的需要,研制了390MW液化天然气(LNG)联合循环发电机组仿真机。
In 1949, the largest thermal power unit of China was 10 MW and the highest transmission voltage was 220 kV, all designed and made by foreign countries.
1949年我国火电最大机组为1万千瓦,输电电压等级最高为220千伏,且全部为外国设计制造。
It analyses 200 MW hydrogen Leaking causes and introdces its treating measures so as to raise safty and economy of the unit operation.
分析了200MW机组氢气泄漏原因,并对其处理措施进行介绍,提高了机组运行的安全性和经济性。
This paper analyzes the problem exited in rubber ball cleaning unit, Shenmu Power Generation Corporation with 2 units (the capacity of each unit is 100 MW).
分析了神木发电公司2台100MW机组胶球清洗装置存在的问题,提出并实施了一系列处理方案。
The mathematical model for two-phase flow and heat transfer of wet steam in exhaust pipe for a 600 MW power generating unit with direct air cooling is established.
建立了600MW发电机组直接空冷排汽管道内湿蒸汽两相流动和传热的数学模型。
The fracture of blind plate bolts on a coal gas heater of 350 MW gas turbine unit were systematically characterized and analyzed by a series of macroscopic and microscopic analysis methods.
采用宏观和微观分析法对350MW燃气轮机组煤气加热器盲板螺栓断裂进行了系统的表征分析。
A remodeling design of circulating pump of 600 MW power unit is introduced which adopts different conversion factors for the impeller and guide blade according to the same model pump.
介绍了600MW火电机组用大型立式循环水泵的一种改型设计方法,即针对同一模型,叶轮与导叶体采用不同的换算系数进行设计。
This paper presents studies on advanced chemistry diagnosis with combination of latest technology on knowledge database and expert diagnosis for 300 MW generating unit with full chemistry instruments.
针对仪表取样设备较齐全的300MW火电机组,结合最新的知识库及专家诊断技术,重点探讨了化学高级诊断方面的问题。
The pure electronic hydraulic control of No. 5 200 MW generating unit in Jingmen Cogeneration Power Plant is realized by retrofitting the original hydraulic governing system using DEH.
荆门热电厂采用数字电液调节系统(DEH)对5号机组原有液压调节系统进行改造,实现了汽轮机纯电调控制。
This paper studies economy analysis index system of burning blended coal of fire resistant coal from Viet Nam and free-burning coal from Tashan of China or Indonesia on 600 MW super critical unit.
研究了600 MW超临界机组掺烧越南无烟煤等极难燃煤种和塔山煤、印尼煤等极易燃煤种的经济性分析指标体系,给出了一套较为简单的、适合现场评估的经济分析指标。
The furnace waterwall fouling and slagging of a 200 MW coal fired unit at Fuxin Power Plant is tested and data specimens have been gained.
对辽宁省阜新电厂200MW机组燃煤锅炉进行了多工况热态测试,获得了数据样本。
Based on one 200 MW coal-fired power unit, the optimization of the pulverized coal-fired fineness has been studied.
对某电厂200MW燃煤机组运行过程中的煤粉细度进行优化分析,得出煤粉细度对机组运行性能的影响规律。
CFD software is used to perform 3-d numerical simulation of steam flow field inside direct air-cooling exhaust steam pipe of a 660 MW supercritical unit.
利用计算流体动力学软件(CFD),对某660MW超临界发电机组直接空冷排汽管道内的水蒸汽流场进行了三维数值模拟研究。
The RB functional test on a 350 MW generating unit and test result analysis were introduced.
介绍了3 5 0MW机组RB功能的试验过程及结果分析,对其它机组具有一定的参考价值。
There are many technical features of the condenser for 1000 MW ultra super-critical power unit in Zou Xian Power Plant.
概述世界发达国家的超临界和超超临界火力发电技术的演绎过程,剖析国外典型超超临界机组的技术特性。
There are many technical features of the condenser for 1000 MW ultra super-critical power unit in Zou Xian Power Plant.
概述世界发达国家的超临界和超超临界火力发电技术的演绎过程,剖析国外典型超超临界机组的技术特性。
应用推荐