In the last, the paper designs and analyses the Graph Theory algorithm and drives a conclusion that the problem of the arranging of curriculum schedule is NP - hard problem.
在文章的最后我们对课表超图的图论算法进行设计与分析,并得出该问题是一个NP难问题。
The vehicle-scheduling problem with time window is also a NP-hard problem being more complicated than VSP.
带有时间窗的车辆优化调度问题是比VSP复杂程度更高的NP难题。
The fill in problem for graphs is a well known NP hard problem.
图的最小填充问题是熟知的NP-困难问题。
Coloring of conflict graphs has been used in high level synthesis to map operators, values and data transfers onto Shared resources, however, finding a minimum sized coloring is NP hard problem.
高层次综合中通过对冲突围着色方式把操作、变量值、数据传输映射到共享资源中,然而寻找图着色所需的最小颜色数目是个NP难题。
But it is a NP-Hard problem to get the minimal attribute reduction.
但求取任意问题的最小属性集是一个NP难问题。
Integer Programming is a famous NP hard problem. This paper presents a new algorithm, in which the method of similar dimidiate is adopted.
整数规划是NP困难的经典问题之一,将传统的二分搜索方法推广应用到整数规划的解空间中,提出一种求解整数规划的新算法。
Three dimension packing problem with multi constraints is a complicated combinatorial optimization, and is NP HARD problem. It is difficult to obtain on optimal solution.
多约束条件下的三维装箱问题是一个复杂的组合优化问题,属于NP- HARD问题,其求解是很困难的。
Optimization of system reliability is a NP hard problem, and people can not find the precise method for result.
系统可靠性优化已被证明是一个NP完全问题,不存在精确的求解方法。
Strip layout is the key procedure in progressive die design, it is known as a NP hard problem.
级进模工步排样是级进模设计的核心,理论上属NP完全问题。
The problem of maximizing total weighted satisfaction level for single machine with fuzzy due-date is a NP-hard problem.
单机模糊交货期总加权满意程度最大化问题是一个NP -难问题。
Because the planning problem includes integral constrains and nonlinear constrains, it is always a NP hard problem.
此类规划问题包含有大量的整数规划及非线性约束,因而被广泛认为是一类NP难题。
Power network planning is a NP hard problem difficult to be solved.
电网规划是一个较难解决的NP难问题。
Automatic test paper generation is a NP hard problem while restrictions exist.
试题库自动组卷问题是一个NP难题。
In complexity theory, set packing problems is an important NP-hard problem, which is used widely in the fields of scheduling and code optimization.
在复杂性理论中,此问题是一类重要的NP难问题,被广泛应用于调度、代码优化和生物信息学等领域。
As a combinatorial optimization problem, three dimension packing problem with multi-constraints is NP-HARD problem. It is very difficult to obtain an optimal solution.
作为一类组合优化问题,多约束条件下的三维装载问题属于NP - Hard问题,其求解也是相当困难的。
Finding an optimal scheduling for such an environment is a NP-hard problem, and so heuristic approaches must be used in general to get an optimal approximation solution.
由于在这样的环境中找到一个最优的调度是一个NP难问题,通常运用各种启发式算法来找到近似最优解。
Test set problem is a NP-hard problem with wide applications.
测试集问题是一个有着广泛应用的NP难问题。
It is difficult to solve in large scale because the LRP is a typical NP-hard problem in combinatorial optimization.
由于定位-车辆路线问题是组合优化问题中一个典型的NP难题,大规模时难以精确求解。
It has been proved the computation of minimal reduction and full reduction both is NP-hard problem, in artificial intelligence the common way is to employ heuristic knowledge to reduce.
研究表明,最小约简的计算和全部约简的求算都是NP问题,在人工智能中,解决这类问题的一般方法是利用启发式信息进行约简。
But the RWA in mesh networks is a NP-hard problem which can not be solved optimally with exhaustive search in the endurable time. Hence, we designed a heuristic algorithm to solve it.
而格状网络中的RWA是个NP -难问题,它不可能在有限的时间内通过穷举搜索来获得其优化解,为此我们设计了一个启发性算法以解决这个问题。
Attribute reduction of rough sets is an NP hard problem, but there is not a popular efficient algorithm presently.
粗糙集的属性约简是一个NP难的问题,但没有一个目前流行的有效的算法。
Recent studies show that the problem is NP-hard.
最近的研究成果表明这一问题是NP难问题。
In this paper we propose there efficient arithmetic-weal search, much space search and overall situation search for sowing NP-hard problem.
提出三种有效的快速算法——局部搜索、多空间搜索和全局搜索来解决NP难度问题。
Graph Coloring problem (GCP) is an NP hard problem.
图着色问题(GCP)是NP完全问题。
In order to deal with the timetable problem, the NP-hard problem, this paper designs a new method by the use of R_timetable, which is based on the character of college courses arrangement.
为了处理课程表问题这个NP完全类问题,根据大学编排课表的特点设计了一种全新的使用r _时刻表的设计方法。
Absrtact: Task scheduling algorithm has been proved to be a NP hard problem in the dynamic, heterogeneous and complicated grid environment.
摘要:在动态、异构的复杂网格环境中,任务调度算法已被证明是一个NP难问题。
The connected augmentation of weighted graphs is NP hard problem that has been proved.
加权图的连通扩充问题已被证明是NP完全问题。
The black and white salesman problem (BWTSP) is a new NP-hard problem, which can be divided into the undirected BWTSP and the directed BWTSP according to the symmetry of edges in graph.
黑白旅行商问题(BWTSP)是近年来出现的新NP -难解问题,根据图中边是否对称可以分为无向BWTSP和有向BWTSP两种。
The black and white salesman problem (BWTSP) is a new NP-hard problem, which can be divided into the undirected BWTSP and the directed BWTSP according to the symmetry of edges in graph.
黑白旅行商问题(BWTSP)是近年来出现的新NP -难解问题,根据图中边是否对称可以分为无向BWTSP和有向BWTSP两种。
应用推荐