• As for the nuclear power safety, a variety of non-destructive testing on the production of nuclear fuel assembly is required during the manufacturing operation in NPIC.

    单位生产核燃料组件制造过程中必须经过多种无损检测,其中在焊接工艺之后进行外形综合尺寸的检测就是重要部分。

    youdao

  • FITLINK is one of main programs of NDFMPS that is core nuclear design and fuel management program system, and is a treatment program of cross section parameter of fuel assembly.

    FITLINK是NDFMPS堆芯设计燃料管理程序系统主要程序之一,一个组件截面参数处理程序。

    youdao

  • The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    大亚湾核电站由年换料改为18月换料,燃料组件AF A2g改为afa3g,堆中子学参数发生了较大变化因此需要许多事故重新进行分析。

    youdao

  • The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    大亚湾核电站由年换料改为18月换料,燃料组件AF A2g改为afa3g,堆中子学参数发生了较大变化因此需要许多事故重新进行分析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定