From the manager's perspective, these activities occur continuously throughout the project, as shown in Figure 3-2, and form the basic pattern by which the work on an iteration is planned and managed.
从管理人员的观点出发,这些活动在整个项目中会不断地发生,如图3 - 2所示,并形成基本模式(可以按照这样的模式对关于迭代的工作进行计划和管理)。
From the manager's perspective, these activities occur continuously throughout the project, as shown in Figure 3-2, and form the basic pattern by which the work on an iteration is planned and managed.
从管理人员的观点出发,这些活动在整个项目中会不断地发生,如图3 - 2所示,并形成基本模式(可以按照这样的模式对关于迭代的工作进行计划和管理)。
应用推荐