Total work period of main installation of project shall be 100 days which be calculated on and from the date at which contractor access practically to project site.
本合同工程安装的主体总工期为100天,以施工单位实际进场之日起开始计算。
The operator of the relevant nuclear installation is the major body of accountability for on-site emergency work.
核设施营运单位是核事故场内应急工作责任主体。
Our responsible for on-site equipment installation, and commissioning work until the normal operation of equipment;
我方负责现场设备安装、调试工作,直到设备整体正常运行;
Our responsible for on-site equipment installation, and commissioning work until the normal operation of equipment;
我方负责现场设备安装、调试工作,直到设备整体正常运行;