Traditional open-pit mining boundary features fixed slope with benches and planar bottom.
传统的露天矿开采境界为固定帮有台阶、露天底平面型。
Relative to the waste rock dump of underground mining, open-pit mining needs a larger one.
相对于地下开采的废石场,露天开采的排土场占地面积要大得多。
Mining transport system is one of the most important production links in open-pit mining process.
矿山运输系统是露天矿开采工艺中非常重要的生产环节。
Open-pit limit optimization is an important content in open-pit mining design and production process control.
露天境界优化是露天矿开采设计和生产过程控制的重要内容。
With the yearly increase of the depth of open-pit mining, the water infiltration of borehole can not be ignored.
露天矿开采深度逐年增加,炮孔内的渗水越来越不容忽视。
Research on the safety and stability of slope in open-pit mining is very significant to safety production of open mines.
研究露天开采边坡的安全稳定对露天矿山的安全生产具有重要意义。
The technology is very useful for exploiting gentle-inclined thin bauxite body as well as for open-pit mining of iron ore.
该工艺对于缓倾斜薄矿体铝土矿、铁矿露天开采具有重要意义。
Open-pit mining follows the same sequence of oprations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Open-pit mining follows the same sequence of operations as underground mining: drilling, blasting, and loading and removing waste and ore.
露天采矿遵循与地下采矿相同的作业顺序:钻孔、爆破、装载并运走废料和矿石。
Greenhouse gas emissions of tar sands crude are 40% higher than conventional oil, and the open-pit mining has devastated Alberta's boreal forest.
焦油砂的温室气体排放量比普通石油高40%,露天采矿已经极大地破坏了阿尔伯塔的北方气候带森林。
The influence of underground water on side slope stability of open-pit mining stope was probed. The existent problems at present were explained.
探讨了地下水对露天采场边坡稳定性的影响,并对目前存在的问题作了必要的说明。
With more and more open-pit mines transferring into deep open-pit mining, research on the law of the movement and damage to high and steep slope rock is focused on.
随着越来越多的露天矿山转入深凹露天开采,高陡边坡岩体运动损害规律研究越来越受到人们所认识和重视。
The open-pit mining has more advantages than underground mining, but its disadvantages is also very obvious, that is, a lot of rocks are also peeled in minerals exploitation.
露天开采比地下开采有很多的优越性,但缺点也是非常明显的,那就是在开采矿石的同时,还要剥离大量的岩石。
The most common approach to extracting metal-bearing ore from a porphyry copper deposit is by open-pit mining, although such mines also typically include some underground activities.
从斑岩含铜矿床开采含金属的矿石,最主要的方式是露天开采,尽管这种矿床常会伴随一些地下的地质活动。
It is reported that the mining area rich in coal resources, coal mining can be thick, buried shallow dip small coal occurrence stability, abundant reserves, suitable for large-scale open-pit mining.
据介绍,这一矿区煤炭资源丰富,可采煤层厚、埋藏浅、倾角小、煤层赋存稳定、储量丰富,适于大型露天开采。
Mining operations at the existing open pit are due to cease by theend of 2012, although ERA is processing a proposal to develop the undergroundRanger 3 Deeps exploration area.
尽管ERA正在处理一份开发Ranger3Deeps地下勘探区的提议,但现有露天矿的开采作业将于2012年底到期。
Production of dust in the course of open pit mining in Jinduicheng Molybdenum mining Corporation was analysed. The prevention and counter measures of dust pollution was put forward.
分析了金堆城钼业公司露天采矿过程中粉尘污染物的产生,提出了粉尘污染的防治与对策。
The combined oPen pit and underground mining system has found wide application in depeit mining.
矿床开采中露天与地下的联合开采法得到了广泛的应用。
With, the intensification of open pit mining expansion of high road, railway, industrial and civil constructions, a lot of problems on slope sliding have been left.
随着露天开采规模和深度的增加、公路铁路的大量修建、工业及民用建筑用地,出现了大量岩土边坡问题。
In open pit mining project the stability of high slope is affected and controlled by many factors, such as topography, meteorology, hydrology, stratum lithology and geological structure conditions.
露天采矿工程中的高边坡稳定性受到很多因素的干扰与控制,其中包括地形条件,气象、水文条件,地层岩性条件,地质构造条件等。
The presented article employs numerical simulation to analyze the stability of the open pit slope when mining in the open pit slope and mine.
在先露天后井工的开采条件下,研究了井工开采对露天边坡稳定性的影响过程。
The optimization design mainly consists of two contents: adjustment of the mining boundary of open pit and optimization of production scale.
优化设计主要包括两方面的内容:露天开采境界的调整和生产规模的优化。
An experimental test of bench mining in the high and dangerous slope of a certain open-pit mine was made.
在某露天矿山的高危边坡上进行了台阶采矿的试验研究。
During more and more open pit transiting to concavity open mining, people make much account of the study on the best slope mechanical configuration, which in favor of the stability of concavity slope.
随着越来越多的露天矿山转入深凹露天开采,有利于深凹边坡稳定性的最优边坡力学形状研究越来越受到人们所认识和重视。
The establishment of the computer model for the ore body of open pit mine is the basis for the optimization of deposit mining boundary and the mining production scheduling.
露天矿矿体计算机模型的建立是进行矿床开采境界优化及制定矿山生产计划的基础。
Controlled slope wall blasting plays key role in open pit mining.
边坡控制爆破在露天矿山起着至关重要的作用。
In the course of mining, there are many mines with combined underground and open pit.
在各类矿产资源的开采过程中,有许多矿区属于地下与露天复合开采情况。
In the course of mining, there are many mines with combined underground and open pit.
在各类矿产资源的开采过程中,有许多矿区属于地下与露天复合开采情况。
应用推荐