• This paper describes construction method of steel open caisson as well as measurement control and measure of rectifying deviation.

    文章介绍了钢板沉井施工方法及顶管过程中的测量控制纠偏措施

    youdao

  • The invention relates to a final elevation control method for open caisson construction, belonging to the technical field of open caisson construction.

    发明涉及一种沉井工程最终高程控制方法。本发明属于沉井工程技术领域

    youdao

  • In this paper, the method of matrix analysis is used to the cross section of rectangle open caisson structure of the variable thickness, and exact results are worked out.

    矩阵分析方法厚度矩形沉井结构横断面进行受力分析,求出了精确解。

    youdao

  • In this paper, the method of matrix analysis is used to the cross section of rectangle open caisson structure of the variable thickness, and exact results are worked out.

    矩阵分析方法厚度矩形沉井结构横断面进行受力分析,求出了精确解。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定