Approximately 85% of the pipeline will be constructed using soft-ground tunneling methods and the remainder will be constructed using conventional open-cut methods.
大约85%的管道将兴建利用软地面掘进方法,而其余的将使用常规明挖施工方法。
Approximately 85% of the pipeline will be constructed using soft-ground tunneling methods and the remainder will be constructed using conventional open-cut methods.
大约85%的管道将兴建利用软地面掘进方法,而其余的将使用常规明挖施工方法。
应用推荐