It is necessary that stripping plan be timely provided during the opencast mining.
露天矿生产过程中,需要及时提供采剥工程平面图。
An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.
针对露天矿采掘进度计划优化编制问题,建立了一个数学模型,同时较充分地考虑了作业条件下的模型建立和问题的处理。
An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.
针对露天矿采掘进度计划优化编制问题,建立了一个数学模型,同时较充分地考虑了作业条件下的模型建立和问题的处理。
应用推荐