Control to load sway during operation of overhead traveling crane is a key problem and many studies have been done to solve the problem.
桥式起重机运行过程中的防摆控制是起重机控制的一个关键问题,许多学者对此进行了大量的研究。
Main girder and other components of overhead traveling crane are typical welded structures, the primary failure type of which is fatigue crack.
桥式起重机主梁等构件是典型的焊接结构,其主要失效形式是疲劳断裂。
This paper introduces an optimization design method for overhead traveling crane structure with double bridge which is based on system analysis.
介绍了基于系统分析的双梁桥式起重机桥架结构优化设计方法。
The paper expounds a way to get stress amplitude spectrum of main girders of overhead traveling crane through computer simulation combining virtual prototype technology and computer random simulation.
本文将虚拟样机技术与计算机随机模拟方法结合,探讨了通过计算机仿真的方法获得桥式起重机主梁应力幅谱的基本途径。
The paper expounds a way to get stress amplitude spectrum of main girders of overhead traveling crane through computer simulation combining virtual prototype technology and computer random simulation.
本文将虚拟样机技术与计算机随机模拟方法结合,探讨了通过计算机仿真的方法获得桥式起重机主梁应力幅谱的基本途径。
应用推荐