The optimization operation is calculated taking Lishui river basin parallel connection system as the example compares it and the conventional operation scheme results.
以澧水流域并联系统为例进行了优化调度计算,并以常规调度方案成果进行了分析比较论证。
The optimization operation is calculated taking Lishui river basin parallel connection system as the example compares it and the conventional operation scheme results.
以澧水流域并联系统为例进行了优化调度计算,并以常规调度方案成果进行了分析比较论证。
应用推荐