The change of discharge and diversion ratio of the main junction is calculated by the 1-d model, and the influence of the engineering on the whole Pearl River Delta networks is analyzed.
同时利用一维数模计算工程后水面线及河网主要节点流量和分流比的变化,从整体的角度分析工程对整个珠江三角洲流域的影响。
The change of discharge and diversion ratio of the main junction is calculated by the 1-d model, and the influence of the engineering on the whole Pearl River Delta networks is analyzed.
同时利用一维数模计算工程后水面线及河网主要节点流量和分流比的变化,从整体的角度分析工程对整个珠江三角洲流域的影响。
应用推荐