Beijing Fuxing the pipeline Equipment co., Ltd. is a professional production and sale of the pipe trench integrated companies.
北京金福星管道设备有限公司是一家专业生产、销售沟槽管件的综合性公司。
Therefore the general construction process scheme is worked out as follows: open trench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.
经过调研和反复现场勘察,确定的总体施工方案为:挖明沟排水,作业带晾晒,正常组对焊接,沉管下沟。
Along the cable trench and pipe bracket installation.
沿电缆沟及管道支架安装等。
Along the cable trench and pipe bracket installation.
沿电缆沟及管道支架安装等。
应用推荐