• Therefore the general construction process scheme is worked out as follows: open trench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.

    经过调研反复现场勘察,确定总体施工方案:挖明沟排水作业带晾晒,正常组对焊接,沉

    youdao

  • Therefore the general construction process scheme is worked out as follows: open trench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.

    经过调研反复现场勘察,确定总体施工方案:挖明沟排水作业带晾晒,正常组对焊接,沉

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定