So the research on power system planning is very important.
对电力系统优化规划进行研究具有重大的现实意义。
Substation locating is an important part of power system planning.
变电所选址是电力系统规划的一个重要环节。
Power load forecasting is the base of electrical power system planning.
电力系统规划由电力负荷预测、电源规划和电网规划构成。
Load forecasting is the foundation of power system planning and operation.
负荷预测是电力系统规划、计划、用电、调度等部门的基础工作。
This paper develops a practicable method for mid-voltage power system planning.
本文提出一种实用的中压配电网络规划方法。
Study of practical reliability evaluation models and processes in power system planning was also made.
对电力系统可靠性指标体系做出总结,提出了适用于电网规划阶段的可靠性指标体系。
Safe and steady analysis for electric power system is one of main duties of electric power system planning and operation.
电力系统的安全稳定分析是电力系统规划和运行的主要任务之一。
The application of probabilistic load flow analysis in power system planning and operation are investigated in this paper.
文中探讨概率潮流计算在电力系统规划设计和运行方式研究中的应用。
As the basis of electric power system planning, the accuracy of load forecast is directly related to the construction of power network.
负荷预测是电力系统规划的基础,其准确度直接影响到电网建设。
Mid-voltage distribution network planning is not only one part of the whole planning, but also an important part of power system planning.
中压配电网规划既是配电网总体规划的一部分,也是整个电力系统规划的重要组成部分。
The result shows it possess instructional significance and referenced value for the actual and future rural power system planning in China.
研究结果对我国现在和将来的农村电网规划与改造具有指导意义和参考价值。
Power customer interruption cost functions (PCICF) are important for power system planning, operation, and security pricing under deregulation.
电力用户停电损失函数对电力系统规划、运行和电力市场下的安全费用计算等具有重要意义。
Recently, the analysis of static security in relation to power system planning and on-line applications has become a subject of increased interest.
在电力系统规划设计和在线应用方面,静态安全分析已成为近年来深感兴趣的课题。
With gradually increasing proportion of distributed generation (DG) in power sys tem, traditional power system planning faces substantial challenges and new request.
随着分布式发电(DG)在电力系统中所占比重越来越大,对传统的电力系统规划提出了新的挑战和要求。
Through analyzing the arisen uncertain factors after the detachment between the power plant and the power grid, a novel mode for power system planning, that power grid pl.
通过分析厂网分开后电力工业出现的一些新的不确定因素,提出了电网规划应对电源建设起指导作用的电力规划新模式。
In addition, the paper studies the design and construction of GIS database for rural power system planning and software method of rural power system planning based on GIS.
本文还研究了农村电网规划GIS数据库的设计和建立,以及基于GIS的农村电网规划应用系统的开发方法。
This thesis' approach can fit the new situations of the decision-making technique of urban power system planning problem, with a result better than other traditional approaches.
本文在城网规划中应用的层次分析法,能够比传统方法更好的适应城网规划中决策方法的发展趋势。
The dynamic and digital real-time simulation of power system is believed as an indispensable tool for power system planning, protective and control devices designing and testing.
电力系统动态数字实时仿真已成为规划电力系统,设计与检验电力系统控制、保护以及调度设备的主要工具。
Load forecasting is an important research content of power system planning and running, belongs to stratagem forecasting, and is a premise for reliable supplying and economic running.
负荷预测是电力系统规划和运行研究的重要内容,属于战略预测,是保证电力系统可靠供电和经济运行的前提。
Based on systematically analyzing the research situation of distribution power system planning, this paper puts forward a new idea of introducing GIS into rural power system planning.
本文系统分析了配电网规划的研究现状,提出在农村电网规划中,引入GIS的新思想。
This paper introduces a FAHP based MADM method in urban power system planning and the procedure of applying this method. The method will be a new way for urban power system planning MADM.
介绍了基于三角模糊数的模糊层次分析法,及其在某小区电网规划方案综合评判中应用的过程,为城市电网规划决策综合评判提供了一种新方法。
Rational planning of local reactive compensation and transformer capacity is very important for demand side management to reduce power losses and improve the economical power system operation.
合理的无功就地补偿和选择变压器容量可以降低损耗,提高系统运行的经济性,是电力需求侧管理的重要内容。
A new approach to evaluate power system risk in planning, design, operation and maintenance was introduced in this paper.
介绍一种新的可用于电力系统规划、设计、运行及维护领域风险评估的方法。
Power load forecasting is the basis of planning and operation of electric power system. It is also an important part of electric power market performing.
电力系统负荷预测是电力系统规划与运行的基础,是电力市场运作中的重要组成部分。
The results show that, the presented methods are valid and feasible for extension planning of power system.
计算实例表明所用方法对电力系统电源扩展规划是有效的、可行的。
The accuracy of power load forecasting is significant to the reasonable planning and construction of power system.
电力负荷预测的准确性对于电力系统的合理规划与建设意义重大。
In this paper, an introduction of its applications in power system transient stability analysis and control, planning of switching operation, and disturbance diagnosis is presented.
文中对多代理技术目前在电力系统暂态稳定分析与控制、倒闸计划和故障诊断等方面的应用做了概要介绍。
Power system load forecast, which is the base of power market technique supporting system, is an essential part of power system operation, control and planning.
电力系统负荷预测是电力系统运行、控制和规划不可缺少的一部分,是电力市场技术支持系统的基础。
This paper presents a reliability based method for spare planning of power system equipment.
提出基于可靠性的电力系统设备备用规划方法。
This paper presents a reliability based method for spare planning of power system equipment.
提出基于可靠性的电力系统设备备用规划方法。
应用推荐