The dwelling house and the slope are stabilized by construction of piles in pre-bored holes and improvement of dewatering & cut-off drainage measures.
通过在相应部位施工钻孔灌注桩,完善相关排水、隔水系统等措施,使住宅和边坡达到稳定。
The dwelling house and the slope are stabilized by construction of piles in pre-bored holes and improvement of dewatering & cut-off drainage measures.
通过在相应部位施工钻孔灌注桩,完善相关排水、隔水系统等措施,使住宅和边坡达到稳定。
应用推荐